Sökresultat:
291 Uppsatser om Wall beams - Sida 1 av 20
Beräkningsmall för väggskivor enligt Eurokoder
The regulatory framework for constructional calculations in Sweden did expire In January the 1.st, 2011.Since then the constructional regulatory that originally were composed by Boverket (BKR) has been replaced by new common range (Eurocodes) for the entire European Union. This transition has led to changes in existing rules and standards regarding dimensioning area in Grids and has forced a need for updating to structural Engineers.The new calculation system has caused time-consuming studies of the new rules and a proper understanding of all the advice and regulations for the entire profession.This study has been carried out in cooperation with the firm "Knut Jönson Ingenjörs AB i Stockholm?, that has been affected by this transition as all other consulting firms. The firm has requested for a calculation method of Wall beams according to Eurocodes. The study's focus is therefore to clarify the rules and guidelines regarding the design of Wall beams according to the new regulation.
Från ståtlig befästning till vittrande världsarv : En jämförelse av byggnadstekniska metoder för sammanbindning av skalmurar
This is a final year project considering constructional techniques for joining cavity walls. The project is related to an ongoing scientific programme about the restoration of The City wall of Visby located on Gotland. The programme was set by Riksantikvarieämbetet as a reaction to a collapse of the outer masonry wall shell which took place in February 2012.The City wall of Visby is a medieval fortification built out of limestone during the 13th century. The wall is constructed as a cavity wall with two separate masonry shells connected to each other through an intermediate core. During the 14th century the wall was heightened which lead to a higher stress, especially in the outer wall face.
Datormodellering av en värmelagrande betongväggs inverkan på det termiska klimatet i ett växthus
This report describes the building of a computer model that makes it possible to simulate the thermal climate in a greenhouse. The computer model is built on the physical theory of heat exchange that occur in a greenhouse, such as radiation and convective heat exchange. The model also includes the heat storage that is active in a greenhouse.The computer model is used to simulate the thermal climate in a greenhouse under three periods, winter, spring and summer. It also investigates which effect a concrete wall has on the thermal climate in a greenhouse. The purpose of putting a concrete wall in the greenhouse model is to investigate the possibility to store heat during the day and then use this heat when the temperature drops during the night.The result from the simulations shows that a concrete wall levels the big difference in temperature that normally occurs under a day in a greenhouse.
Experimentella och teoretiska uträkningar för skruv- och bäddhållfasthet för takinfästningar mot stålstomme
Lättelement located in Örnskoldsvik AB is one of Sweden's leading companies in the development of building elements in the form of roofs, walls and floors made ??out of light beams. The company has clients from Lund to Kiruna, and from Norway. This means that the elements have high standards when they have to take many different loads from wind and snow due to such wide geographic variation.The roof elements are structured so that the main body is made of light beams with an I?profile.
Fuktskador i ytterväggar på grund av vattenintrång
Moisture damage in buildings is a serious issue that leads to problematic consequences and high economic costs. Despite the knowledge and awareness existing about moisture problems, extensive damager still occurs today. Studies of moisture in the exterior wall constructions shows that the issue if often caused by rain and water intrusion. These kinds of problem result in major costs usually because the companies have to replace the material and structural components and also in some cases tear down large parts of the buildings.The work includes moisture theory and descriptions of four different exterior wall constructions, wood stud wall with plastered facade, exterior wall with wood facade, exterior wall with concrete, and exterior wall with brick facade. Our thesis work describes how the constructions are affected and moisture damage due to water intrusion.
Vertikalarmering i tegelbalkar ur arbetsmiljöperspektiv
Statistics of occupational injuries show that bricklayers are among the most exposed, with heavy lifting by far the most common cause of long-term sick leave. Prefabricated brick beams create yet another risk of injuries that can be prevented by auxiliary equipment or alternative solutions. From articles, interviews with masons and from a survey carried out in conjunction with this report, it appears that there are frequently difficulties in the use of available means for lifting and handling. Previous studies on the subject of transverse reinforcement in masonry beams indicate a viable method for bridging large openings in masonry walls. This bachelor thesis delves into whether the idea could be realized in today's brick construction with a view to improving occupational health and safety.
Tid- och kostnadsanalys av innerväggar
In our thesis we will compare interior walls, both bearing and non-bearing. All of thewalls analyzed are currently used in production by Skanska Construction, who is alsoour employer/supervisor for the project. The different wall types will be comparedfocusing mainly on time, cost and workability. All of these walls aside from the nonbearingwall are constructed using concrete, either prefabricated or cast on site..
Hisskärna av skalväggar i höga byggnader : Ett alternativ till den platsgjutna kärnan
A common way to stabilize high rise buildings is to use an elevator core built of concrete. Today, we use to build these elevator cores of in-situ concrete. Precast concrete twin wall (double wall) is a semi-finished product that has become more common in recent years. This diploma work studies how the twin wall works out as structural elements in an elevator core. The work also shows some possible ways of designing twin walls and highlights some important parts of the design that will be vital to the stability of the building. The result shows that it is important to think through where the element joints should be placed.
Prefabricerade väggelement av hampabetong
Lime Hempcrete consists of lime, water and hemp and creates an insulating, sound-absorbing, lightweight and environmentally friendly material that can be used in wall, roof and floor structures (Bevan & Woolley 2008). This construction method is not yet developed in Sweden as there has been a ban on the cultivation of the hemp plant. This ban on the cultivation of hemp was removed in 2003, when the material got a boost. You can use it in many different ways and not just in the construction industry (Ahlsten, 2010).In this study we have investigated the possibility to produce prefabricated wall elements of LHC. We have also studied its mechanical properties and dehydration time.
Ljudisolering - Teknisk felsökning och kvalitetssäkring av lätta bygg-system
By using industrialized building, pre-installed modules can be delivered to the construction site where they are easily mounted. This method has many advantages compared to on-site manufacturing, for example, the precision during the production process should be much higher than building each wall and floor on site. Furthermore, the quick erection procedure when using prefabricated elements and the possibility to use weather protection has the advantage of not being dependent on weather conditions, and many other factors.Masonite Beams AB is a Swedish company (a member of the Norwegian company, Byggma ASA) with a relatively new technology using light weight beams as bearing elements in the walls and a certain stiff board lamella slap which is mounted on the top of the floor structure creating an integrated stiff beam / board floor structure. The elements are flat which make it much easier to transport the elements from the factory to the building site where the building parts are easily mounted with special mounting stud.One of the main drawbacks of lightweight structure is the sound transmission. The main topic is low frequency annoyance, however the complex structural elements and their mutual sensitive connections other acoustical problems might appear.
Utvärdering av den bärande tegel- och betongstommen i en byggnad från år 1916
This Master thesis is about a postal- and telegraphic building in Eskilstuna, Sweden. The construction methods for the specific building and buildings in general from the same time are described. The purpose of the report is to describe the loads acting on the building and how it has been built and why it has been rebuilt during the years. After this, possibilities of reconstruction and adaptation for today?s demands can be evaluated.
"En mycket boksynt man" Karl-Gunnar Walls liv som stadsbibliotekarie och litteraturvän
The purpose of this master thesis is to describe the professional and literary life of Karl-Gunnar Wall, city librarian of Katrineholm between 1944 and 1975. Questions at issue are the reasons for Walls literary interests, Walls choice of occupation, crucial personal meetings, the context in which Wall acts, Walls fundamental principles as a librarian and as a critic, and the features comprising Walls life history. The method used is a merely qualitative one called "life history". It is founded on in-depth interviews with the persons involved and emanates from the individuals own story about his life. I have carried out three taped interviews; one with Wall himself, and two with his colleagues.
Bojkonstruktion
The division of Electricity at Uppsala University runs a project called Lysekil project, they have designed a buoy that uses the waves to create electric power from a generator attached to the bottom of the sea.Uppsala University is closely connected with the company Seabased and the university makes use of their facilities in Lysekil. When they designed the buoy issues occurred, the geometric design was flawed, brackets with a short shelf life and it is generally uneconomic.A study visit was done in Lysekil on Seabased facility. With this visit the project started, which is to improve the design of the buoy and the attachment of wires leading to the generator. In this project we have chosen to use a beam system with three beams that are attached to the buoy. Then a wire attached to a plate that sits between the beams will be leading to the generator. Two proposals for construction are created, what distinguishes them are the brackets between the beams and the buoy.From these constructions, the design that is considered most optimal for our project is chosen.All parts of the buoy have been modeled and the drawings are designed in ProEngineer software.The two constructions are compared with each other, but the whole focus is on the second and final structure. The report begins with an introduction describing Lysekil project, and a task description of our project.The project aims to produce an optimal buoy that will be easy to design, materials restrictive with good durability and an economical solution.Wave power true function has been studied, mechanical and finite element analysis of beams, buoy and plate design.This has been presented in this report, where in the various chapters can read more about the processes. Although the relevant facts and information on this project and buoy development is included.
Robotinteraktion på litet företag : Examensarbete Industriautomation
The division of Electricity at Uppsala University runs a project called Lysekil project, they have designed a buoy that uses the waves to create electric power from a generator attached to the bottom of the sea.Uppsala University is closely connected with the company Seabased and the university makes use of their facilities in Lysekil. When they designed the buoy issues occurred, the geometric design was flawed, brackets with a short shelf life and it is generally uneconomic.A study visit was done in Lysekil on Seabased facility. With this visit the project started, which is to improve the design of the buoy and the attachment of wires leading to the generator. In this project we have chosen to use a beam system with three beams that are attached to the buoy. Then a wire attached to a plate that sits between the beams will be leading to the generator. Two proposals for construction are created, what distinguishes them are the brackets between the beams and the buoy.From these constructions, the design that is considered most optimal for our project is chosen.All parts of the buoy have been modeled and the drawings are designed in ProEngineer software.The two constructions are compared with each other, but the whole focus is on the second and final structure. The report begins with an introduction describing Lysekil project, and a task description of our project.The project aims to produce an optimal buoy that will be easy to design, materials restrictive with good durability and an economical solution.Wave power true function has been studied, mechanical and finite element analysis of beams, buoy and plate design.This has been presented in this report, where in the various chapters can read more about the processes. Although the relevant facts and information on this project and buoy development is included.
Omega System Kalibrering: Strål X-Separation mätning och kalibrering
Micronic Laser Systems AB produces and develops machines for the photo mask production market. One of their products is the Omega machine which exposes photo masks using 5 laser beams simultaneously. It is important that the distance between the each laser beam, the x-separation, is the same. The x-separation is today measured by exposing a photo mask with a certain pattern and thereafter measured with a metrology system. This takes to much time and it is desired to find a faster method to measure the x-separation without loosing precision.The task for this master thesis is to improve an existing measurement method which uses a calibration mask.